Links
Summarized
Field Sample Results
Facility
Analyte Level List
Return Links
Water
System Facilities
Water
System Detail
Water
Systems
Water
System Search
County Map
Glossary
|
Water System Facility Detail
Water System No. : |
IL1950250 |
Federal Type : |
C |
Water System Name : |
FULTON |
State Type : |
C |
Principal County Served : |
WHITESIDE |
Primary Source : |
GW |
Status : |
A |
Activity Date : |
01-01-1970 |
|
State Asgn ID No. : |
TP03 |
Type : |
TP |
Facility Name : |
TP03 BLENDED WATER:TP01 AND TP02 |
Activity Status : |
A |
Activity Reason
Text : |
TP03 is the single entrypoint to the distribution. Water from TP01 and TP02 joins in a finished water transmission main near 9th St and 13th Av, travels several blocks and enters the elevated tank at 9th St and 7th Av. TP03 is at the PRV station where all water flows out of the storage tank, into the distribution system. (BH 2014)
|
Activity Status
Date : |
04-28-2014 |
Sampling
Points
Sampling
Point |
Location |
Type |
TP03 |
BLEND WATER:TP01&TP02 AT ELE TANK |
EP |
Annual Operating
Periods
Start Month |
Start Day |
End Month |
End Day |
Effective Begin Date |
Effective End Date |
|